Projects
Product Details
Basic Info.
Member: Steel Column
Type of Steel For Building Structure: H-Section Steel
Carbon Structural Steel: Q235
Application: Steel Workshop, Steel Fabricated House, Structural Roofing, Frame Part, Steel Structure Bridge
Main Steel Frame: H Steel, Z or C Purlin
Building Material: Steel Column, Steel Beam, Steel Truss
Surface Treatment: Painted or Galvanized
Connection: Bolt Connection or Welded Connection
Downspout: PVC Pipes
Color: All Color /as Customer Required
Window: Aluminum Alloy Window or PVC
Cladding System: Sandwich Panel, Prefab Steel Sheet
Transport Package: Shipping Container
HS Code: 7308900000
Production Capacity: 50000 Ton/Year
Product Description
Our Advantages
1. Leading independent design ability
With help of moder designing softwares such as AUTOCAD, PKPM,3D3S, SAP2000, TSSD, Tekla Structures(Xsteel), 3DS MAX we provide full designing and detailing service to all customers.
Producing and Manufaturering by Ourselve
We purchase the best quality raw material from An steel Co., Ltd.
We have 2 modern factories with a total area of 21000 square meters to produce.
Visualization of the Production Process
We can provide you with picture information of all production links, from raw materials to steel processing, the whole process of visual production.
Strict Quality Inspection
With good quality steel material, we have AWS-D1.1/D1.5 welding quality system and professional CWI welding inspector to ensure high quality of the product.
Packing and Delivery
Container and pallet packing will protect the surface paint or zinc of the steel structures.
Delivery will be made 23 days after receipt of full payment.
Installation Guide
Installation instruction and video will be provide, we can also send our engineers to your site as installation guide, they will teach your people how to build project.
Our Service:
Professional design and engineering team:
Full solution for site camp design. We could make the design for whole camp as per your requirement.
Procurement and Manufacture for all material for prefabricated building:
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
Site management & Installation supervision:
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK
Packing & Delivery:
Inspection: 50% inline inspection and 100% full final inspection, make sure all output w/o any mistake
Packing: per customer's requirements or per product sizes, full protection packing
Shipping: per customer's requirements or per container sizes
Need Quotation?
Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
We reply online 24 hours.
Address
12-01, Building 2, No. 380, Zhengyang Middle Road, Chengyang Street, Chengyang District
Get in Touch with Us